Current Project

Woodsmith Mine

Woosung Tubbing is currently working with Anglo American on a major fertiliser mining project in the North of England.
The Woodsmith project is a unique development in a national park, setting new standards for sustainable mining.
Comprising two deep shafts, the client’s needs were detailed and specific:

120 tubbing segments per week.
9,080 in total.
Extremely tight 2mm tolerances.
A rigid delivery schedule.
A mining supervisor on site at the Woosung factory to ensure each tubbing was up to standard.


Not only did Woosung meet expectations – we exceeded them. Considering the tubbing would be shipping from a hot climate to a colder, we silica wrapped each piece, calculated a route that would ease the temperature transition, and ensured each 20 foot container arrived securely, and on schedule.

Woosung Tubbing – it’s what we do.

Inside the Project

Everything at the factory is expertly crafted and rigorously checked before anything is shipped.

At Woosung, our tubbing division works with your design team to create precisely what is needed for your project. We want our clients happy with our product, and to form lasting partnerships with your future endeavours. As you can see from the images below, our team are highly skilled, motivated, and work to exacting schedules.